Upcoming GMADA Projects in Mohali (2026)

No GMADA plot or flat scheme is open as of 26 October 2026. Its next estates (Eco City 3, Eco City 4, a Mullanpur township and Aerotropolis Blocks E–J) are at the land-award or land-pooling stage. What you can buy now are RERA-registered private projects on sites GMADA has auctioned or planned: in Sectors 78, 88 and 99, Aerocity, IT City, Eco City 2 and Medicity.

Updated 29 sources Big Brothers research desk

GMADA schemes open today
0
New GMADA estates in the pipeline
9
Raised in GMADA’s 2026 e-auctions
₹8,528 cr
Projects in GMADA areas on our list
10

Quick answer

Upcoming GMADA projects in Mohali: the short answer

  • No GMADA scheme is open right now. GMADA’s Schemes page says no schemes are currently available (checked 26 October 2026). Anyone selling a “GMADA pre-launch plot” is not selling a GMADA scheme.

  • Next GMADA estates: Eco City 3 (716 acres, New Chandigarh: award December 2025, environmental clearance 29 September 2026, land-pooling forms until 15 November 2026), Aerotropolis Blocks E–J (3,523 acres, award 20 July 2026), Eco City 4 (526 acres, notified 2 June 2026) and a 309-acre township at Mullanpur; the 196-acre Sector 87 commercial centre got its land award on 23 October 2026. None has a plot scheme, price or date yet.

  • Where new homes are coming from: GMADA’s 2026 e-auctions raised ₹3,136.97 crore (January–March) and ₹5,391 crore (July–August), including group-housing sites in Aerocity Block G and a 27.78-acre mixed-use site in Sector 62. Private projects on such sites are the real “upcoming GMADA projects”.

  • Pre-launch or just launched in GMADA areas: Leafsong Retreat by Hero Homes (Sector 99), Ananda Crown (Sector 78), The Marq by Atlantis (Aerocity Block B) and Noble Magnollia (Sector 88) on sites GMADA sold, plus GMI Lux Housing in GMADA’s Sector 102-A, each with a Punjab RERA number.

  • Check the address: most projects that portals file under “GMADA Aerocity” are registered in Dyalpura or Chhat villages under Zirakpur, next to Aerocity rather than in it.

On this page
  1. 01Is a GMADA scheme open?
  2. 02Upcoming GMADA estates
  3. 032025–26 timeline
  4. 04Projects in GMADA areas
  5. 05Existing GMADA estates
  6. 06“GMADA Aerocity” listings
  7. 07Pre-launch vs soft launch
  8. 08How GMADA sells land
  9. 09Compare GMADA areas
  10. 10Claims vs facts
  11. 11Checklist before you pay
  12. 12More on Big Brothers
  13. 13FAQs
  14. 14Sources and method
01Status today

Is any GMADA scheme open right now?

No

No GMADA plot or flat scheme is open for applications

Checked 26 October 2026 on GMADA’s Schemes page

GMADA’s Schemes page reads “Currently Schemes are not available”. Its new estates are still at the land-acquisition stage, so no developer or broker can be taking authorised bookings for GMADA plots in them. What is open: private projects on sites GMADA has already sold (listed below), and GMADA’s periodic e-auctions of commercial, group-housing and institutional sites.

How you’ll know when one opens

  • GMADA Schemes page

    New plot or flat schemes appear here with their brochure.

  • GMADA Public Notices

    Land awards, land-pooling deadlines and draw results. Most are scanned PDFs, several in Punjabi.

  • PUDA e-auction portal

    GMADA’s auctions of sites, SCOs and booths run here.

  • Newspaper notices

    GMADA also issues its notices as newspaper advertisements; the PDFs on its site carry the advertisement numbers.

02Upcoming GMADA projects

GMADA’s next estates and where each one stands

Since Punjab withdrew its Land Pooling Policy-2025 in August 2025, GMADA acquires land under the 2013 land-acquisition law and offers landowners an optional package of developed plots instead of cash. An estate reaches the public only after the award, possession, layout approval and the landowners’ plot draw; GMADA’s own plots or sites then come through a scheme or an e-auction. The Tribune counts more than 11,600 acres in this pipeline across Greater Mohali and New Chandigarh.

Upcoming GMADA estates and their status, October 2026
EstateWhereSizeStageLast official stepNext
Eco City 3, New ChandigarhNew Chandigarh716 acresAward done · pooling forms openEnvironmental clearance, 29 Sep 2026Pooling forms close 15 Nov 2026
Aerotropolis Blocks E–JAirport Road belt3,523 acresLand award declaredAward, 20 Jul 2026Possession, LOIs, layout
Aerotropolis Pockets A–DAirport Road1,651 acresPartly on holdLOIs issued; part frozen (2026)Landowners’ draw (no date)
Eco City 4, New ChandigarhNew Chandigarh526 acresNotified (SIA stage)Notified, 2 Jun 2026SIA, then award
Low- and high-density township, MullanpurNew Chandigarh309 acresAward done · pooling forms openAward (2026); forms till 15 NovLayout, landowners’ draw
Sector 87 commercial city centreMohali (Sector 87)196 acresLand award declaredAward, 23 Oct 2026R&R award, planning, e-auctions later
Aerotropolis Extension, BanurMohali and Banur tehsils2,489 acresSection 11 notifiedSection 11, Aug–Sep 2026Section 19, award
Expo City, MohaliMohali tehsil181 acresSection 11 notifiedSection 11, 17 Aug 2026Section 19, award
Commercial City Centre, New ChandigarhNew Chandigarh230 acresSection 11 notifiedSection 11, 31 Aug 2026Section 19, award
Award done · pooling forms open

Eco City 3, New Chandigarh

Takipur, Kansala, Kartarpur, Hoshiarpur, Rajgarh and four other villages, New Chandigarh (Kharar sub-division)

GMADA’s next residential township, with commercial and institutional sites. The land award was announced on 23 December 2025 and SEIAA Punjab granted environmental clearance on 29 September 2026. No public plot scheme, price or launch date has been announced.

Area
716 acres
Award
₹3,690.32 crore
Environmental clearance
29 Sep 2026
Landowners’ plot sizes
200, 400, 500 sq yd (+100 sq yd commercial)

Latest (13 Oct 2026): GMADA published the environmental clearance (EC No. EC26B3813PB5297526N, dated 29 September 2026).

What’s next (15 Nov 2026): Last date for landowners’ land-pooling forms. Then possession, layout approval and the landowners’ draw; any GMADA scheme comes after that.

Land award declared

Aerotropolis Blocks E–J

Kurdi, Chhat, Kishanpura, Patton, Siaun, Bari, Matran and Bakarpur villages, on the airport side of Mohali

The next and largest phase of GMADA’s Aerotropolis around the international airport. Awards were announced on 20 July 2026 at ₹6.29 crore to ₹8.29 crore an acre. No layout, plot sizes or public scheme have been announced.

Area
3,522.98 acres
Award
₹23,457.74 crore
Award date
20 Jul 2026
Planned blocks
E, F, G, H, I, J

Latest (20 Jul 2026): Land awards announced for eight villages, amid landowner protests.

What’s next: Possession, landowners’ letters of intent and the layout plan. GMADA is raising up to ₹15,000 crore to pay for its acquisitions (October 2026).

Partly on hold

Aerotropolis Pockets A–D

Airport Road (Aerotropolis phase 1)

About 1,651 acres acquired earlier for the first Aerotropolis phase. Letters of intent are being issued to landowners, but development and part of the compensation are frozen by proceedings linked to Vigilance Bureau FIR No. 16, over alleged fraudulent compensation of about ₹147 crore.

Area
about 1,651 acres
Stage
Award; LOIs being issued

Latest (6 Jul 2026): Revised land-pooling policy: every plot, including preferential-location plots, goes into the landowners’ draw. A ₹509.20 crore contract for Aerotropolis internal roads and services was awarded in October 2025, with about two years to finish.

What’s next: Development depends on the court and Vigilance case; no draw date has been announced.

Notified (SIA stage)

Eco City 4, New Chandigarh

Kartarpur, Kansala, Rajgarh and Boothgarh villages (Majri sub-tehsil, Kharar tehsil)

A new 526-acre residential township, notified for acquisition on 2 June 2026. It is at the social impact assessment (SIA) stage; the award, layout and any scheme are still to come. Launch dates that brokers quote for “Eco City 4” have no official basis.

Area
526.03 acres
Notified
2 Jun 2026 (Section 4(1))

Latest (2 Jun 2026): Section 4(1) notification started the social impact assessment (reported 5 June 2026).

What’s next: SIA report and review, then the Section 11 and 19 notifications and the award.

Award done · pooling forms open

Low- and high-density township, Mullanpur

Village Mullanpur Garib Dass, New Chandigarh (eco-sensitive zone)

GMADA’s planned estate of high-end (low-density) and high-density housing next to Eco City. The ₹1,932.38 crore award covers 309.30 acres; landowners’ land-pooling forms close on the same date as Eco City 3’s.

Area
309.30 acres
Award
₹1,932.38 crore

Latest (12 Oct 2026): Land-pooling form deadline extended to 15 November 2026 (joint notice with Eco City 3).

What’s next: Possession and layout. Villa entitlements in the eco-sensitive zone needed Cabinet approval (September 2025).

Land award declared

Sector 87 commercial city centre

Sector 87, Mohali (Nanu Majra, Sohana, Manak Majra and Sambhalki)

A 196-acre commercial hub GMADA is acquiring inside Mohali. After a September postponement that followed the Enforcement Directorate’s searches at GMADA, the land award was announced on 23 October 2026 at ₹4.27 crore to ₹5.61 crore an acre. Landowners can take cash or opt for land pooling; farmers and political parties rejected the rates.

Area
196.44 acres
Award
₹4.27–5.61 crore an acre
Use
Commercial

Latest (23 Oct 2026): Land award announced for Sohana, Nanumajra, Manakmajra and Sambhalki; the rehabilitation award will come separately.

What’s next: Possession and planning; GMADA sells commercial sites by e-auction once an area is developed.

Section 11 notified

Aerotropolis Extension, Banur

Mohali and Banur tehsils: Manakpur Kallar, Tangori, Kurda, Sekhan Majra, Karala, Khizargarh, Banur and Azizpur

A 2,489-acre extension of the Aerotropolis being acquired in 2026. After the social impact assessments, the Section 11 preliminary notifications were issued between 19 August and 9 September 2026; land in these villages cannot be sold or mortgaged without the collector’s approval.

Area
2,489 acres
Stage
Section 11 (Aug–Sep 2026)

Latest (9 Sep 2026): Last of the Section 11 notifications (Azizpur); objections were invited within 60 days.

What’s next: Section 19 declaration, then the award.

Section 11 notified

Expo City, Mohali

Rurka, Dharamgarh, Ladiali and Safipur villages (Mohali tehsil)

A 181-acre site the state is acquiring for GMADA’s planned “Expo City” in Mohali tehsil. The Section 11 notification was issued on 17 August 2026; GMADA has not published what the Expo City will contain.

Area
181.48 acres
Notified
17 Aug 2026 (Section 11)

Latest (17 Aug 2026): Section 11 preliminary notification for the four villages.

What’s next: Section 19 declaration, then the award.

Section 11 notified

Commercial City Centre, New Chandigarh

Bansepur, Chahar Majra, Sangala and Tira villages (Kharar tehsil)

A 230-acre commercial centre planned in the New Chandigarh master plan, with its access roads. The Section 11 notification was issued on 31 August 2026.

Area
229.84 acres
Notified
31 Aug 2026 (Section 11)

Latest (31 Aug 2026): Section 11 preliminary notification; the social impact assessment found few people likely to be displaced.

What’s next: Section 19 declaration, then the award.

03Timeline

GMADA in 2025–26: what happened and what’s next

Official steps in date order, with the next deadline at the end.

  1. Withdrawn

    Punjab withdraws the Land Pooling Policy-2025

    After farmer protests and a High Court stay on 7 August, the statewide policy is withdrawn; the withdrawal notification is dated 14 August.

  2. Decided

    Back to the 2013 land-acquisition law

    Punjab reverts to the RFCTLARR Act, 2013 for Mohali acquisitions, keeping land pooling as an option for landowners.

  3. Contract

    ₹509.20 crore Aerotropolis roads contract

    Letter of award for Aerotropolis internal roads with water, sewerage and electrical works, to be finished in about two years.

  4. Revised

    Optional land-pooling package revised

    Landowners can take 1,000 sq yd residential plus 200 sq yd commercial, or 1,600 sq yd residential, per acre (first for Sectors 84 and 87).

  5. Notified

    Section 11 notification for 4,059 acres

    Aerotropolis Blocks E–J (3,535 acres) plus 524 acres in Sectors 87, 101 (part) and 103.

  6. Opened

    IT City–Kurali expressway opens to traffic

    The 31-km, six-lane road from IT City Chowk to Kurali takes through traffic off Airport Road and Kharar.

  7. Award

    Eco City 3 land award: 716 acres

    Awards of ₹4.27 crore to ₹6.46 crore an acre across nine villages; ₹3,690.32 crore in all.

  8. E-auction

    37 of 42 sites sold for ₹3,136.97 crore

    Including two group-housing plots in Aerocity Block G (₹311.74 crore and ₹141.27 crore) and an education site in Sector 83 Alpha (₹238.05 crore).

  9. Reported

    11,103-acre acquisition plan

    Seven townships, seven sectors, three Aerotropolis pockets, the Sector 87 commercial centre and 1,240 acres of master-plan roads.

  10. Notified

    Eco City 4 notified (526 acres)

    Section 4(1) notification for Kartarpur, Kansala, Rajgarh and Boothgarh.

  11. Revised

    Land-pooling package revised again

    1,000 sq yd residential plus 210 sq yd commercial, or 1,630 sq yd residential, per acre, with transferable Special LOIs: the third revision in 12 months.

  12. Award

    Aerotropolis Blocks E–J award

    3,522.98 acres in eight villages, ₹23,457.74 crore.

  13. Notified

    Section 11 notifications: Aerotropolis extension, Expo City, New Chandigarh commercial centre

    Preliminary acquisition notifications for the Aerotropolis extension villages (19 August to 9 September), Expo City (181.48 acres, 17 August) and the New Chandigarh Commercial City Centre (229.84 acres, 31 August).

  14. E-auction

    27 of 37 properties sold for ₹5,391 crore

    Led by a 27.78-acre mixed-use site in Sector 62 (₹1,742.31 crore, to Aggarwal Plaza Pvt Ltd), an Aerocity A-Block hospital site (₹162.16 crore) and a Sector 66 Beta hotel site (₹122.42 crore).

  15. Searches

    Enforcement Directorate searches GMADA

    Searches at GMADA’s Sector 62 headquarters and 27 other sites over alleged irregularities; GMADA then postponed public meetings, including the Sector 87 award.

  16. Cleared

    Eco City 3 environmental clearance

    Granted by SEIAA Punjab; GMADA published the notice on 13 October.

  17. Award

    Sector 87 land award: 196.44 acres

    Awards of ₹4.27 crore to ₹5.61 crore an acre in four villages; landowners can take cash or opt for land pooling. Farmers and political parties rejected the rates.

  18. Deadline

    Land-pooling forms close: Eco City 3 and the Mullanpur township

    For landowners only; there is no public scheme yet.

04Pre-launch and new-launch GMADA projects

Pre-launch and new-launch projects in GMADA areas (October 2026)

These private projects stand on group-housing or mixed-use sites GMADA auctioned, or in GMADA-planned sectors, and are in their launch phase or just launched. Each has a Punjab RERA number. They are private projects, not GMADA schemes: GMADA sold or planned the land, and the developer sells the homes. For launches across the rest of Mohali, see pre-launch projects in Mohali.

Pre-launch and new-launch projects in GMADA areas, October 2026
#ProjectWhereTypePriceStatusRERA
1Leafsong Retreat by Hero Homes
Hero Homes (Hero Realty)
Sector 99Flats₹1.57 Cr+Pre-launchPBRERA-SAS81-PR1432
2Ananda Crown
Banson Projects (Ananda group)
Sector 78Flats₹2.67 Cr+Launch phasePBRERA-SAS81-PR1421
3The Marq by Atlantis
Krishna Infra Projects (Atlantis)
Aerocity Block BFlats + SCOs₹3.03 Cr+Pre-launchPBRERA-SAS81-PR1418
4GMI Lux Housing
Greymarble Infra
Sector 102-AFlatsOn requestPre-launchPBRERA-SAS81-PR1401
5Noble Magnollia
CRA Buildtech LLP (Noble)
Sector 88Flats₹3.0 Cr+New launchPBRERA-SAS81-PR1294
6Opus One
Gee Bee Eagles Pvt Ltd
Eco City 2Flats₹3.63 Cr+Stage not confirmedPBRERA-SAS81-PR1267
7Evoq Antalia
Evoq Realtech LLP
Sector 66Flats₹4.37 Cr+New launchPBRERA-SAS81-PR1271
8The Tiara
Sham Exotic Group
MedicityFlats₹4.00 Cr+Stage not confirmedPBRERA-SAS80-PR1063
9Noble Aurellia
CRA Buildtech LLP (Noble)
Sector 88Flats₹2.33 Cr+Under constructionPBRERA-SAS81-PR1136
10Homeland Group, Sector 62 (two projects)
Homeland Group
Sector 62Not published—Not RERA-registered—

Prices are portal or broker asking prices on super area, before GST and charges, unless marked otherwise. Ask the developer for the current price sheet.

  1. Sector 99

    1
    Pre-launch

    Leafsong Retreat by Hero Homes

    Hero Homes (Hero Realty) Sector 99, Mohali

    Price
    ₹1.57–2.39 Cr
    portal asks, Sep–Oct 2026
    Type
    2.5 and 3 BHK flats
    Sizes
    1,490–2,154 sq ft (super)
    RERA
    PBRERA-SAS81-PR1432
    Possession
    Aug 2033 (per portals)

    Hero’s second Mohali project, unveiled on 21 September 2026 on an 8.71-acre Sector 99 site bought at a GMADA auction in 2025 (₹262.75 crore, as reported by PTI). Portals list about 712 homes in five towers. Hero shows it under new launches with no construction updates yet, and publishes no price. The RERA number shown by the developer (registered September 2026) is too recent for the official list dated 25 September.

    • On a GMADA auction site
    • Registered Sep 2026
  2. Sector 78

    2
    Launch phase

    Ananda Crown

    Banson Projects (Ananda group) Group housing chunk site, Sector 78, near Sohana Gurudwara

    Price
    ₹2.67–3.75 Cr
    broker asks, Jun–Oct 2026; indicative
    Type
    3, 3+1, 4 and 5 BHK flats
    Sizes
    2,425–4,100 sq ft
    RERA
    PBRERA-SAS81-PR1421
    Possession
    Apr 2032 (per Housing.com)

    Registered with Punjab RERA on 17 August 2026 on a 3.91-acre GMADA group-housing site: four towers of 27–29 floors with about 268 homes. In August the developer said the public launch would follow within weeks. No developer price list was public on 26 October, and broker listings quote sizes that differ from the developer’s.

    • GMADA group-housing site
    • Registered 17 Aug 2026
  3. Aerocity Block B

    3
    Pre-launch

    The Marq by Atlantis

    Krishna Infra Projects (Atlantis) Mixed-use chunk site, Block B, Pocket 1-A, Airport Road (Sector 82 side)

    Price
    ₹3.03–7.52 Cr
    portal list rates + GST, Oct 2026
    Type
    3, 4, 4+1 and 5+1 BHK flats, plus SCOs
    Sizes
    2,525–5,050 sq ft (super)
    RERA
    PBRERA-SAS81-PR1418
    Possession
    Not published

    A 3.4-acre mixed-use scheme on a GMADA chunk site: four residential towers with about 284 homes, an SCO and retail block and a clubhouse, per the developer. Registered in August 2026; on 26 October the project site showed a “pre-concept” master plan, with no construction updates or developer price list.

    • GMADA mixed-use site
    • Registered Aug 2026
  4. Sector 102-A

    4
    Pre-launch

    GMI Lux Housing

    Greymarble Infra Sector 102 Alpha, PR-9 Airport Road (IT City road)

    Price
    On request
    no public price list
    Type
    3, 4 and 5 BHK flats, 6 BHK penthouses
    Sizes
    1,765–5,516 sq ft (carpet)
    RERA
    PBRERA-SAS81-PR1401
    Possession
    Dec 2030 (RERA, per Housing.com)

    Registered in July 2026 in GMADA’s master-plan Sector 102 Alpha, on private land beside the 200-ft PR-9 road. No construction evidence yet; the developer markets it as GMI Residences.

    • GMADA master-plan sector
    • Registered Jul 2026
  5. Noble Magnollia, Sector 885
    New launch

    Noble Magnollia

    CRA Buildtech LLP (Noble) Group Housing Site No. 5, Sector 88

    Price
    ₹3.0–5.5 Cr
    portal and broker asks, Dec 2025–Oct 2026
    Type
    3+1, 4+1 and 5+1 BHK flats, penthouses
    Sizes
    3,351–5,551 sq ft (super)
    RERA
    PBRERA-SAS81-PR1294
    Possession
    Dec 2030 (RERA validity)

    Registered on 17 December 2025 on GMADA’s Group Housing Site 5 in Sector 88, next to Noble Aurellia. The developer’s September 2026 construction update shows the plot excavated and basement work under way, with no tower above ground yet.

    • GMADA group-housing site
    • Basement work under way
  6. Opus One, Eco City 26
    Stage not confirmed

    Opus One

    Gee Bee Eagles Pvt Ltd Group Housing Chunk Site No. 01, Block B, Eco City 2, New Chandigarh

    Price
    ₹3.63–7 Cr
    portal asks, Sep 2026; unverified
    Type
    Large flats and penthouses
    Sizes
    5 BHK about 3,533 sq ft carpet (RERA, Tower 1)
    RERA
    PBRERA-SAS81-PR1267
    Possession
    Oct 2034 (RERA)

    Registered in October 2025 on an 8.75-acre GMADA site in Eco City 2: 11 towers of up to 33 floors, with a declared project cost of ₹1,610.5 crore. We found no dated site photos or progress figures, so ask for the latest RERA quarterly report before booking.

    • GMADA group-housing site
    • Completion date 3 Oct 2034
  7. Evoq Antalia, Sector 667
    New launch

    Evoq Antalia

    Evoq Realtech LLP Near BSNL Society, Sector 66, Mohali

    Price
    ₹4.37–8.40 Cr
    portal asks, Sep–Oct 2026
    Type
    3+1, 4+1 and 5+1 BHK flats, penthouses
    Sizes
    2,730–5,251 sq ft (super)
    RERA
    PBRERA-SAS81-PR1271
    Possession
    Sep 2030 (RERA)

    Four towers of stilt plus 17 floors on 4.4 acres in GMADA Sector 66, with a declared cost of ₹651.4 crore (RERA start date 29 September 2025). The bhoomi pujan and groundbreaking took place on 2 September 2026.

    • GMADA sector
    • Groundbreaking 2 Sep 2026
  8. The Tiara, Medicity8
    Stage not confirmed

    The Tiara

    Sham Exotic Group GH Site No. 2, Medicity, New Chandigarh

    Price
    ₹4.00–10.40 Cr
    portal asks, Aug 2026; unverified
    Type
    4 BHK flats and penthouses
    Sizes
    4 BHK about 2,090–2,145 sq ft carpet (RERA)
    RERA
    PBRERA-SAS80-PR1063
    Possession
    Apr 2029 (RERA)

    RERA start date 28 May 2024, on GMADA’s Group Housing Site 2 in Medicity: six towers of 29 floors on 5.66 acres. Quarterly reports have been filed since 2024, but we found no dated site photos, so ask for current progress before booking.

    • GMADA group-housing site
    • Completion date 30 Apr 2029
  9. Noble Aurellia, Sector 889
    Under construction

    Noble Aurellia

    CRA Buildtech LLP (Noble) Group Housing Site No. 4, Sector 88

    Price
    ₹2.33–2.80 Cr
    portal and broker asks, 2026
    Type
    3 BHK flats, duplex penthouses
    Sizes
    2,651–2,951 sq ft (super)
    RERA
    PBRERA-SAS81-PR1136
    Possession
    Apr 2028 (RERA)

    Registered on 25 April 2025, now well past launch: the developer’s September 2026 drone video shows towers roughly 7 to 14 floors up. Listed here as the nearest comparison for Sector 88 prices.

    • GMADA group-housing site
    • Towers rising
  10. Sector 62

    10
    Not RERA-registered

    Homeland Group, Sector 62 (two projects)

    Homeland Group Sector 62, Mohali

    Price
    Not published
    not open for booking
    Type
    Residential (details not published)
    RERA
    Not registered yet

    Homeland Group lists two upcoming Sector 62 projects on its website (“Homeland Sector 62” and “Homeland Leisure Valley”). Neither was on the Punjab RERA register dated 25 September 2026, so neither can be advertised for booking or sold yet. Wait for the RERA number.

    • Upcoming
    • No RERA number yet

Next on GMADA land, with no project registered yet: two group-housing plots in Aerocity Block G (sold January–March 2026 for ₹311.74 crore and ₹141.27 crore), the 27.78-acre mixed-use site in Sector 62 (sold to Aggarwal Plaza Pvt Ltd for ₹1,742.31 crore in August 2026) and chunk sites in Aerocity Blocks E, I and J (August 2026). Until a project on these sites shows a Punjab RERA number, it cannot take bookings.

05Existing GMADA estates

GMADA’s existing estates, all registered with Punjab RERA

These estates are built or being built. GMADA still sells sites in them by e-auction, and most of the projects above stand on group-housing or chunk sites it sold here. Each is registered with Punjab RERA in GMADA’s own name (register as on 25 September 2026).

Sites sold by e-auction

Aerocity

Beside the international airport, along PR-7 Airport Road

GMADA’s plotted estate by the airport, with residential plots, SCOs and commercial chunk sites. GMADA is completing internal roads and parks on both sides of the estate.

RERA
PBRERA-SAS80-PR0368
Sold in 2026
Block G (group housing), A (hospital), E, I, J (chunk sites)

Latest (Mar and Aug 2026): Group Housing Plots 1 and 2 in Block G sold for ₹141.27 crore and ₹311.74 crore; in August an A-Block hospital site sold for ₹162.16 crore, and chunk sites in Blocks E, I and J went slightly above reserve.

What’s next: Private launches on the Block G sites (buyers not yet public). The PR-7 Spur linking the Zirakpur bypass to Aerocity was awarded in March 2026, with a late-2027 target.

Sites sold by e-auction

IT City

Sectors 66 Beta, 82 Alpha, 83 Alpha and 101 Alpha, off PR-7 Airport Road

A 1,700-acre GMADA estate for IT, institutional, hotel and group-housing use, with residential plots. Private towers such as The Medallion, La Parisian, Noble Callista, Marbella Royce and The Pinnacle stand on its group-housing sites.

Area
1,700 acres
RERA
PBRERA-SAS81-PM0116

Latest (Mar–Aug 2026): A Sector 83 Alpha education site sold for ₹238.05 crore and a Sector 66 Beta hotel site for ₹122.42 crore.

What’s next: Plot allottees are contesting an enhancement charge of ₹7,845 per sq yd raised 13 years after allotment (September 2026).

Development works on

Sectors 88–89 and Purab Premium Apartments

Sectors 88 and 89, near PR-7 Airport Road

GMADA’s own housing sector: the 1,620-flat Purab Premium Apartments on 37.5 acres (available since 2017), plus group-housing sites sold to private developers.

RERA
PBRERA-SAS81-PM0121
Purab flats
1,620

Latest (2024–26): The Punjab government agreed to buy 167 Purab flats for ₹121.96 crore (November 2024), and in May 2025 GMADA put 227 unsold Purab flats up for e-auction. Private towers are going up on group-housing sites 1 to 5 (Hero Homes, Horizon Belmond, Joy Grand, Noble Aurellia, Noble Magnollia).

What’s next: 76 acres of commercial pockets in Sectors 85, 86 and 88 are at the Section 4(1) stage (March 2026).

Developed estate

Sectors 76–80

Around Sohana, Mohali

A GMADA residential estate of plots and group-housing sites. Recent private projects here include Homeland Regalia (Sector 77) and Ananda Crown (Sector 78, registered August 2026).

RERA
PBRERA-SAS81-PR0389
Development works on

Eco City 1, Eco City 2 and Eco City 2 Extension

New Chandigarh (Mullanpur)

GMADA’s plotted eco-townships in New Chandigarh. Eco City 2 Extension (96 acres in Hoshiarpur village) was described in August 2025 as ready, with 153 residential plots, 68 commercial plots and four 2.5-acre group-housing sites. GMADA has not published a scheme or price for it.

RERA, Eco City-I (commercial)
PBRERA-SAS80-PC0062
RERA, Eco City-2
PBRERA-SAS81-PM0152
RERA, Eco City-2 Extension
PBRERA-SAS80-PR0347

Latest (Oct 2025): Opus One, on group-housing chunk site 1 in Block B of Eco City 2, was approved by RERA on 4 October 2025.

What’s next: No Eco City 2 Extension scheme date has been announced, and the prices quoted online (₹5,500 to ₹60,000 per sq yd) are not GMADA’s.

Sites sold by e-auction

Medicity, New Chandigarh

New Chandigarh

A GMADA estate for hospitals and medical institutions, with mixed-use and group-housing sites. The Tiara stands on its Group Housing Site 2.

RERA (commercial)
PBRERA-SAS80-PC0118

Latest (Mar 2026): Hospital plots H1 and H2 sold for ₹30.14 crore and ₹28.11 crore; a 28.22-acre mixed-use site (reserve ₹961.01 crore) and hospital site HO2 went unsold.

What’s next: Unsold sites can return in a later e-auction.

06Check the address

“GMADA Aerocity” on property portals: what the RERA register says

Housing.com’s “GMADA Aerocity” project list (updated 24 September 2026) is mostly private projects that Punjab RERA registers in Dyalpura (Dayalpura) or Chhat villages under Zirakpur, next to Aerocity. Zirakpur is inside GMADA’s planning area, so these colonies need GMADA licences, but they are not part of GMADA’s Aerocity estate, and their roads and services come with the colony rather than with Aerocity’s works.

Projects listed as GMADA Aerocity on portals, with their RERA-registered locations
ProjectPunjab RERA numberLocation in the RERA register
Escon Primera, Phases 1 and 2 (Malwa Projects)PBRERA-SAS79-PR0529, PR0852Village Chhat, Patiala Road, Dera Bassi tehsil
Aero Greens 2 (Mannat Maple)PBRERA-SAS79-PM0167Village Dayalpura, sub-tehsil Zirakpur
Riverdale Aerovista (Manglam Infra)PBRERA-SAS79-PR0290Village Dayalpura, Zirakpur
Riverdale Aerovista Extension-2 (Manglam Infra and others)PBRERA-SAS79-PR0727Village Dyalpura, sub-tehsil Zirakpur
Aeropark (Aeorpark Developers and others)PBRERA-SAS79-PR1137Village Dyalpura, Zirakpur
Aeroland Heights (K.S. Developers)PBRERA-SAS79-PR1319Village Dyalpura, MC Zirakpur
Splande Supreme (Sarayu Construction)PBRERA-SAS79-PR0926Villages Dyalpura and Nabha, MC Zirakpur
Motia Aero Greens (Shiva Developers and others)PBRERA-SAS79-PR0824Village Dayalpura, sub-tehsil Zirakpur

Source: Punjab RERA list of registered projects as on 25 September 2026. SAS79 numbers belong to the Dera Bassi tehsil series, which includes Zirakpur. Projects inside GMADA’s Aerocity carry a block in their RERA address, for example “Block-G, Aerocity”.

07What the words mean

Pre-launch and soft-launch GMADA projects: what they really are

GMADA itself never runs a “pre-launch” or “soft launch”. It announces a scheme in a public notice, takes applications for a fixed period and allots by draw, or sells sites by e-auction. The terms below are used by private developers selling homes on GMADA land, and one rule decides whether such a sale is legal.

Pre-launch

Bookings open before the public launch and before construction starts, usually at an introductory price. This is allowed only after the project is registered with Punjab RERA. Cheques or “EOI” amounts collected before registration are not.

Soft launch

A quiet, limited release to selected brokers and buyers before the public launch, used to test prices and demand. The same rule applies: the project must already have a Punjab RERA number.

New launch

The project has been launched publicly and work on site has begun (excavation, foundations or basement), with no tower above ground yet.

GMADA scheme

A plot, flat or site sold by GMADA itself through a public notice and brochure. Applications and payments go to GMADA, not to a developer or broker, so there is no pre-launch stage.

08Draw, e-auction or LOI

How GMADA sells plots, flats and sites

GMADA land reaches buyers in one of three ways, and each starts with a public notice from GMADA.

  1. 1

    A scheme with a draw of lots

    For residential plots and flats (such as Purab Premium Apartments in Sector 88), GMADA advertises a scheme with a brochure, takes applications with an earnest-money deposit for a fixed period and allots by a public draw. Eligibility, sizes, prices and the payment schedule are set out in each brochure.

  2. 2

    An e-auction

    Commercial sites, SCOs, booths, group-housing, hotel, hospital and school sites, and some residential plots, are sold to the highest bidder above a reserve price on the PUDA e-auction portal. GMADA’s two 2026 rounds raised ₹3,136.97 crore and ₹5,391 crore.

  3. 3

    Land-pooling LOIs (landowners)

    Landowners who give land for a new estate receive letters of intent (LOIs) for developed plots, allotted later by a draw among them. The July 2026 policy makes the new Special LOIs transferable, so LOIs are traded privately; the final plot depends on GMADA’s layout and draw.

  4. 4

    Allotment, payments and possession

    After a draw or auction, GMADA issues an allotment letter with the payment schedule. Possession follows once the site is developed, and the conveyance deed after full payment and the letter’s conditions. Pay GMADA only through its own portal or bank details.

09Compare GMADA areas

Aerocity vs IT City vs Sectors 78–99 vs New Chandigarh

Where the new supply is, what it is asking today and what to watch. Prices are launch-phase asking prices from the projects above (September–October 2026), not GMADA rates.

Comparison of GMADA areas for new projects, October 2026
AreaWhat’s comingAsking prices nowRoadsWatch out for
Aerocity (PR-7, by the airport)Group-housing towers on Block B and G sites (The Marq by Atlantis); the Aerotropolis estate behind it laterThe Marq: ₹3.03–7.52 crore (3 to 5+1 BHK)PR-7 Airport Road; PR-7 Spur to the Zirakpur bypass awarded, late-2027 target“Aerocity” portal listings in Zirakpur villages; Aerotropolis A–D partly frozen
IT City, Sector 66 and Sector 102-AEvoq Antalia (Sector 66), GMI Lux Housing (Sector 102-A)Evoq Antalia: ₹4.37–8.40 crore; GMI Lux: on requestIT City–Kurali expressway open since December 2025; Ambala–IT City stretch due 15 December 2026 (reported); PR-9₹7,845 per sq yd enhancement dispute for IT City plot allottees
Sectors 78, 88 and 99Ananda Crown (78), Noble Magnollia (88), Leafsong Retreat (99)Leafsong: ₹1.57–2.39 crore; Ananda Crown: ₹2.67–3.75 crore; Noble Magnollia: ₹3.0–5.5 crorePR-7 Airport Road; GMADA’s 200-ft road from Sector 78/79 to the Kharar–Banur roadLong timelines: RERA completion dates run to 2030–2033
New Chandigarh (Eco City, Medicity, Mullanpur)Opus One (Eco City 2), The Tiara (Medicity); Eco City 3 and 4 and the Mullanpur township laterOpus One: ₹3.63–7 crore; The Tiara: ₹4.00–10.40 crore (portal asks, unverified)PR-4 to Mullanpur; the Kurali end of the new expresswayEco City 3 and 4 plots are not on sale; eco-sensitive-zone rules near Mullanpur

Asking prices: portal and broker figures on super area, before GST and charges; sources are listed with each project above.

10Myth vs fact

Claims you will see, and what the record shows

11Before you pay

Eight checks before you pay a booking amount

For private projects marketed as “GMADA projects”. For GMADA’s own schemes, follow only the notice and brochure on gmada.gov.in.

  • The Punjab RERA number

    Ask for it, then find the project on the RERA project search or in the list of registered projects. The promoter, project name, address, number of units and completion date should match the brochure.

  • A licensed colony, not an unauthorised one

    GMADA publishes a list of licensed colonies and mega projects (latest file dated 7 September 2026) and a list of unauthorised colonies. Find the project in the first and make sure it is not in the second.

  • GMADA estate, or a colony next to one?

    Many projects sold as “Aerocity” or “airport road” stand in villages next to GMADA’s estates. That is fine if the colony is licensed, but its roads, water and sewerage come with the colony’s own licence, not with GMADA’s estate works.

  • A written price sheet on carpet area

    RERA requires sale by carpet area. Get the carpet area, preferential location charges, EDC/IDC, parking, club charges and GST in writing (GST is 5% on under-construction homes and 1% on affordable ones).

  • No more than 10% before the agreement

    Don’t pay more than 10% until the agreement for sale is signed and registered (RERA section 13). Pay only into the developer’s project account, never a broker’s personal account, and keep every receipt.

  • The developer’s track record

    Were the developer’s earlier projects delivered by their RERA completion dates? Punjab RERA publishes complaint case status and the projects penalised for violations.

  • The possession date that counts

    Use the completion date in the RERA registration, not the brochure. If possession is late, the Act entitles you to interest or a refund (section 18).

  • Which banks have approved it

    A project approved for home loans by major banks has passed their legal check of title and approvals. Ask which banks, and confirm with the bank.

12On Big Brothers

More projects on GMADA sites, listed on Big Brothers

Projects on GMADA group-housing or commercial sites that are already under construction or ready, with photos, floor plans and enquiry forms on Big Brothers. Status and prices come from each project’s page.

Free shortlist

Want options in GMADA areas that fit your budget?

Tell us your budget, the area you prefer (Aerocity, IT City, Sectors 78–99, Eco City or Medicity) and when you want possession. We’ll share RERA-registered options with current price sheets, and help you read GMADA’s notices.

Request a callback

Frequently asked

Questions about upcoming GMADA projects in Mohali

01

Is any GMADA scheme open in 2026?

No. As of 26 October 2026, GMADA’s Schemes page says no schemes are currently available. Its next estates (Eco City 3, Eco City 4, the Mullanpur township and Aerotropolis Blocks E–J) are at the land-award or land-pooling stage, so there is no plot scheme, price list or application date yet.

02

What are the upcoming GMADA projects in Mohali?

GMADA’s pipeline is Eco City 3 (716 acres) and Eco City 4 (526 acres) in New Chandigarh, a 309-acre low- and high-density township at Mullanpur, Aerotropolis Pockets A–D and Blocks E–J (about 5,170 acres around the airport), a 2,489-acre Aerotropolis extension at Banur, a 196-acre commercial centre in Sector 87 (land award 23 October 2026), and two sites notified in August 2026: Expo City (181 acres) and a 230-acre Commercial City Centre in New Chandigarh. Alongside them, private projects are launching on sites GMADA has auctioned, such as Leafsong Retreat (Sector 99), Ananda Crown (Sector 78) and The Marq by Atlantis (Aerocity).

03

What is the latest on Eco City 3, and when will plots launch?

Eco City 3’s land award (₹3,690.32 crore for 716 acres) was announced on 23 December 2025, and SEIAA Punjab granted environmental clearance on 29 September 2026. Landowners can file land-pooling forms until 15 November 2026. After that come possession, layout approval and the landowners’ draw; GMADA has announced no public scheme or launch date.

04

What is happening with Aerotropolis Mohali?

GMADA announced land awards for Aerotropolis Blocks E–J on 20 July 2026: 3,522.98 acres in eight villages for ₹23,457.74 crore. The earlier Pockets A–D (about 1,651 acres) are issuing letters of intent to landowners, but part of the work is frozen by a Vigilance Bureau case. No public plot scheme has been announced for either.

05

Are there pre-launch or soft-launch GMADA projects?

Not from GMADA: it sells only through public schemes and e-auctions. What brokers call “pre-launch GMADA projects” are private projects on land GMADA auctioned or in its planned sectors. In October 2026 the RERA-registered ones in their launch phase include Leafsong Retreat (Sector 99), Ananda Crown (Sector 78), The Marq by Atlantis (Aerocity Block B) and GMI Lux Housing (Sector 102-A). Projects advertised without a RERA number cannot legally take bookings.

06

Is pre-launch booking legal in Punjab?

Only after the project is registered with Punjab RERA. Section 3 of the RERA Act, 2016 bars advertising, booking or selling before registration, and section 59 allows a penalty of up to 10% of the project cost. Once registered, a promoter may take at most 10% of the price before a registered agreement for sale (section 13).

07

How do I apply for a GMADA plot?

When GMADA opens a scheme, it publishes a notice and brochure on gmada.gov.in with the eligibility, sizes, price, earnest money and last date. You apply within that window, and plots are allotted by a public draw of lots. Sites sold by auction are bid for on the PUDA e-auction portal (puda.enivida.com). No scheme is open as of 26 October 2026.

08

When was GMADA’s last e-auction, and what sold?

The latest round closed on 20 August 2026: 27 of 37 properties sold for ₹5,391 crore, led by a 27.78-acre mixed-use site in Sector 62 (₹1,742.31 crore). The January–March 2026 round sold 37 of 42 sites for ₹3,136.97 crore, including two group-housing plots in Aerocity Block G. GMADA had not announced the next round by 26 October 2026.

09

What does “GMADA approved” mean, and how do I check a project?

For a private project it should mean the colony holds a GMADA licence (or change of land use) and the project is registered with Punjab RERA. Check GMADA’s licensed colonies list and unauthorised colonies list, then the RERA project search. A project on a GMADA-auctioned site will also show the site number in its RERA address.

10

What is a GMADA LOI, and is buying one safe?

A letter of intent (LOI) is GMADA’s promise of developed plots to a landowner who gave land for an estate. The July 2026 policy makes the new Special LOIs transferable, so they are traded. Buying one is a private deal outside RERA: the plot’s location and timing are fixed only at GMADA’s draw, so check the seller’s title and GMADA’s transfer rules before paying.

11

Is GMADA a government body, and is New Chandigarh under it?

Yes. GMADA is the Punjab government’s development authority, constituted on 14 August 2006 under the Punjab Regional and Town Planning and Development Act, 1995. Its area covers Mohali, Banur, Zirakpur, Dera Bassi, Kharar and Mullanpur, among others, and the New Chandigarh master plan falls under it (GMADA).

12

Which is better to buy in: Aerocity, IT City, Sectors 88–89 or Eco City?

It depends on budget and timing. Sectors 78, 88 and 99 have the widest choice of new launches (about ₹1.6–5.5 crore asking, October 2026). Aerocity and IT City suit buyers who want the airport and the IT City–Kurali expressway close by. New Chandigarh (Eco City, Medicity) is quieter and greener, but its new GMADA estates are years away. Compare RERA completion dates, which run from 2028 to 2034.

13

What about Eco City 2 Extension and its plot price?

Eco City 2 Extension is a 96-acre GMADA estate in Hoshiarpur village, New Chandigarh, described in August 2025 as ready with 153 residential plots, 68 commercial plots and four group-housing sites. GMADA has not published a scheme or price for it; the ₹5,500 to ₹60,000 per sq yd figures online are not official.

14

Are GMADA flats available? What about Purab Premium Apartments?

Purab Premium Apartments in Sector 88 is GMADA’s 1,620-flat project on 37.5 acres, available since 2017; in November 2024 the Punjab government agreed to buy 167 of the flats, and in May 2025 GMADA put 227 unsold flats up for e-auction. GMADA has no flat scheme open now, so Purab flats change hands on resale. New flats on GMADA land come from private projects in Sectors 78, 88 and 99, IT City and Aerocity.

15

Can NRIs buy in these projects?

Yes. Under RBI rules, NRIs and OCI cardholders may buy flats, plots in licensed colonies and commercial units without RBI approval, but not agricultural land, plantations or farm houses. Payment must come through banking channels (inward remittance or NRE, FCNR(B) or NRO accounts) (RBI Master Direction). Each GMADA scheme brochure sets its own eligibility.

16

How do I check a project’s RERA registration in Punjab?

Search the Punjab RERA project search or the registered projects list for the number, which looks like PBRERA-SAS81-PR1294. In Mohali district, SAS79 means Dera Bassi tehsil (including Zirakpur), SAS80 Kharar tehsil and SAS81 Mohali tehsil. The promoter, address, units and completion date should match the brochure.

17

GMADA new scheme kab aayegi?

26 October 2026 tak GMADA ki koi scheme open nahi hai. Eco City 3 ke land-pooling forms 15 November 2026 tak bhare ja rahe hain; uske baad possession, layout aur landowners ka draw hoga, phir GMADA apni scheme ya e-auction layega. Official date sirf gmada.gov.in ke Schemes page aur newspaper notice mein aayegi.

18

Is Big Brothers part of GMADA?

No. Big Brothers is a private property portal and channel partner. We track GMADA’s notices and the private projects in GMADA areas so buyers can compare them in one place, but for any GMADA scheme the official notice and brochure on gmada.gov.in are final.

Sources and method

How we made this page

We read GMADA’s Schemes, Public Notices, Ongoing Projects and SIA pages (including its scanned notices), the Punjab RERA list of registered projects as on 25 September 2026, RERA registration copies and news reports from 2025 and 2026. For private projects we took the RERA registration first, then the developer’s own figures and, where none are public, portal or broker asking prices, and we say which is which. We call a project “pre-launch” or “launch phase” only if it is RERA-registered with no tower above ground.

Projects are ordered by how closely they match this page: the newest registrations on GMADA sites first, then older launches, then announced projects that are not yet registered. Last full check: 26 October 2026.

Updates to this page

  1. New page title and description.

  2. Later the same day: the Sector 87 land award of 23 October 2026, the Aerotropolis extension’s Section 11 notifications, Expo City and the New Chandigarh Commercial City Centre added; links to the corrected Aerotropolis project page.

  3. Page published. Checked GMADA’s Schemes, Public Notices and Ongoing Projects pages and the Punjab RERA list as on 25 September 2026.

Sources (29)

  1. 01Schemes (currently none available) GMADA · checked 26 Oct 2026
  2. 02Ongoing projects GMADA · checked 26 Oct 2026
  3. 03Public notices GMADA · checked 26 Oct 2026
  4. 04Eco City 3 environmental clearance notice GMADA · 13 Oct 2026
  5. 05Land-pooling forms deadline, Eco City 3 and Mullanpur township GMADA · 12 Oct 2026
  6. 06Sector 87 award announcement date GMADA · 19 Oct 2026
  7. 07Social impact assessment documents GMADA · checked 26 Oct 2026
  8. 08Licensed colonies and mega projects GMADA · 7 Sep 2026
  9. 09Public notice on unapproved projects GMADA · 23 Aug 2023
  10. 10About the organisation GMADA · checked 26 Oct 2026
  11. 11List of registered projects Real Estate Regulatory Authority, Punjab · as on 25 Sep 2026
  12. 12Real Estate (Regulation and Development) Act, 2016 RERA Punjab copy of the Gazette · checked 26 Oct 2026
  13. 13Project search Real Estate Regulatory Authority, Punjab · checked 26 Oct 2026
  14. 14Punjab to acquire 11,103 acres in Mohali and New Chandigarh The Tribune · 31 Mar 2026
  15. 15Eco City 3: GMADA acquires 716 acres from 9 villages The Tribune · 24 Dec 2025
  16. 16New township on 526 acres in New Chandigarh (Eco City 4) The Tribune · 5 Jun 2026
  17. 17GMADA announces awards for 8 villages, next phase of Aerotropolis The Tribune · 21 Jul 2026
  18. 18Explainer: why Punjab keeps rewriting its land pooling policy The Tribune · 24 Jun 2026
  19. 19Bigger plots for Mohali farmers under revised land pooling policy The Tribune · 9 Jul 2026
  20. 20GMADA e-auction: 37 of 42 sites sold for ₹3,137 crore The Tribune · 7 Mar 2026
  21. 21GMADA auctions 27-acre Sector 62 site for ₹1,742 crore The Tribune · 21 Aug 2026
  22. 22ED searches GMADA and 27 other sites The Tribune · 23 Sep 2026
  23. 23Punjab government to buy 167 Purab flats The Tribune · 27 Nov 2024
  24. 24Mohali IT City–Kurali expressway now open News24 · 22 Dec 2025
  25. 25GMADA’s Sector 87 land rates draw criticism The Tribune · 24 Oct 2026
  26. 26Acquisition notifications (Aerotropolis extension, Expo City, Commercial City Centre) GMADA · Aug–Sep 2026
  27. 2772 GMADA properties go for ₹1,911 crore (Aerotropolis roads contract) The Tribune · 16 Oct 2025
  28. 28Project registration copies (Opus One, Evoq Antalia, The Tiara, Noble Aurellia) Aurum PropTech (copy of RERA data) · checked 26 Oct 2026
  29. 29Acquisition of immovable property by NRIs/OCIs Reserve Bank of India · updated 1 Sep 2022
Template: guide-v1Updated 26 October 2026